sponsored links
CMMiPal

Org processes and gap analysis assists for the CMMI requirements for mapping

Description

Org processes and gap analysis in mapping the CMMI requirements "Assist"
indir.biz Editor: (CMMI Capability Maturity Model - Integrated) Software Engineering Institute (SEI) by Carnegie Melon University have evaluated the maturity of software development as a tool was developed institutions and software development organizations to assign as a criterion for selection is used.


SEI, maturity, ie five levels are defined


1. Perform
2. Managed
3. Defined
4. Quantitatively managed
5. Optmizing
Many organizations and the desired maturity level worldover seeking certification provision. When there are continuous and progressive, most organizations were organized to represent the model of maturity, so there are two ways.


To reach the desired level of maturity, has to fulfill the objectives of the organization model --


1. Over a KPAs (Key Process Areas)
2 designated for each level. Specific goals are set each KPA
3. Applications for each designated special target specific performance can be achieved
4. Each Specific Practice provides specific performance designated a Sub-Applications and determined to produce work products
5. In addition, designated a General Goal
There are 6. Each set of general goals Generic Application performance can be achieved


Basically, the desired level, and only there, that there are three stages to reach


1 said. Gaps Analysis
CMMI model and organizational process assets and organizational process assets and organizational processes
* Between * between
2. Bridge gaps were revealed gaps Analysis
3. Appraisal can now download free CMMiPal 1.0.

sponsored links

COMMENTS

Sign in or register to leave a comment.

Visitor rates

4 Star  
  56

Member rates

4 Star  
  42

Ortalama oy:

3,8

1  2  3  4  5
4.545